1. Testing & Validation
  2. Test Plan

This comprehensive test plan ensures your integration covers all critical scenarios before production deployment. Complete all test cases to validate your integration’s reliability and accuracy.

Download Complete Test Plan

Access the detailed test case document with step-by-step instructions

​
Test Areas Overview

​
1. SKU Synchronization Tests

​
2. Order Lifecycle Tests

​
3. Inventory & Fulfillment Tests

​
4. Inbound Shipment Tests

​
5. Data Synchronization Tests

​
Round-Trip Validation

Critical Test: Ensure complete round-trip data flow from order creation to ERP update.

​
End-to-End Test Scenario

1

Order Submission

Submit test order through your ERP integration

2

MasonHub Processing

Verify order appears correctly in MasonHub OMS

3

Fulfillment Execution

Confirm order picks, packs, and ships

4

Tracking Generation

Validate tracking number and carrier assignment

5

ERP Update

Ensure tracking data flows back to ERP system

6

Customer Notification

Verify customer receives shipping notification

​
Error Handling Tests

​
API Error Scenarios

​
Performance Testing

​
Load Testing Scenarios

  • Concurrent Orders: Submit multiple orders simultaneously
  • Bulk SKU Updates: Process large product catalog changes
  • High-Volume Polling: Test frequent status check scenarios
  • Webhook Bursts: Handle multiple simultaneous webhook deliveries

​
Test Environment Setup

​
Required Test Data

  • Products

  • Customers

  • Inventory

  • Standard products (10-20 SKUs)
  • Bundle products (2-3 bundles)
  • International products (5 SKUs)
  • ORMD products (2-3 SKUs)

​
Test Execution Checklist

1

Environment Preparation

  • Sandbox access confirmed
  • Test data loaded
  • API credentials configured
  • Webhook endpoints set up
2

Test Execution

  • All SKU tests completed
  • Order lifecycle tests passed
  • Fulfillment scenarios validated
  • Data sync methods tested
  • Error handling verified
3

Validation

  • Round-trip testing successful
  • Performance requirements met
  • Error recovery confirmed
  • Integration team sign-off

​
Documentation & Sign-off

​
Test Results Documentation

Document the following for each test case:

  • Test Case ID: Reference number
  • Execution Date: When test was performed
  • Result: Pass/Fail/Blocked
  • Notes: Any observations or issues
  • Retests: If applicable, retest results

​
Ready for Production Criteria

All test cases must pass before proceeding to production deployment.

​
Next Steps

Once all test cases pass successfully, you’re ready to proceed with production readiness planning.